A Lab Figure Budget: Allocate by Task, Seat and Revision Window
A six-person lab example turns a fixed budget into a workable combination of plotting, illustration and panel assembly.

A six-person lab has a hypothetical $300 figure-production budget for a quarter. Two people draw mechanisms, three analyze data and one assembles final manuscripts. Buying six identical subscriptions may be wasteful because those jobs are different.
Inventory deliverables rather than people
List the quarter's output: eight mechanism panels, twelve data plots and two posters. Mark who must change scientific objects, who only comments and who assembles reviewed exports. A plotting analyst may need a reproducible script rather than an illustration account; a manuscript assembler may need alignment and typography rather than generation credits.
| Task | Required master | Frequent correction | Owner |
|---|---|---|---|
| Mechanism illustration | Objects and labels | Change one connection | Two illustrators |
| Data plot | Data plus plotting script | Change units or grouping | Three analysts |
| Final composite | Panel layout plus sources | Reorder panels A–F | One assembler |
This table determines the required workflow. It does not establish which shared-account arrangements a provider permits; check seat terms and use individual authorized access.
Reserve the revision window
Split the quarter into preparation, review and delivery. The costly error is budgeting a single month of access when two coauthors will only return comments later. In our example, mechanism drafting happens in month one, group review in month two and submission in month three.
A proposed allocation might be $120 for drafting tools, $80 held for delayed revisions, $40 for a special asset and $60 uncommitted. These figures are a sample budget, not vendor prices. The $80 reserve stays available until the review date rather than being spent on optional draft styles.
Price the actual credit workload
For a credit-based illustration tool, estimate accepted panels, candidate count and correction rounds separately:
expected credits = panels × candidates per panel × draft cost
+ panels × corrections per panel × correction cost
For eight panels, three candidates each, two credits per draft, one correction per panel and a hypothetical three-credit correction, the estimate is 72 credits: 8 × 3 × 2 + 8 × 1 × 3. A 25% planning reserve makes it 90. Replace both unit costs with the current tool's displayed charges; this example does not state FigEditor's correction price.
If half the panels require four corrections, the estimate changes to 108 before reserve. Revision intensity can matter more than the number of initial images. Record the actual credit change for a complete trial, including failed jobs and their refunds.
Give every project an exit package
When a student leaves, the group should retain permitted masters, final figures, plot scripts, source records and captions. Assign a folder owner before starting. Avoid relying on one person's account history as the only archive.
For example, keep figure3/plots/, figure3/illustration/, figure3/layout/ and a short manifest naming the approved versions. Store experimental data through the institution's approved process. The figure folder should point to the approved data source rather than creating an uncontrolled copy of confidential records.
Spend after a representative trial
Try one difficult mechanism and one six-panel layout in the tools under consideration. In FigEditor, those are distinct journeys through Generate Figure and Figure Layout. Check final dimensions, actual-size labels and one real revision. Confirm current cash amounts and credit rules on the pricing page.
At the end of the quarter, compare planned and actual accepted figures, credits, correction time and extra billing periods. Keep the workflow that reduced the dominant cost in your lab. A fixed budget works better when it follows the actual task than when it is divided equally among tools or people.
